Minka Lavery 4365-84 Bedienerhandbuch

Stöbern Sie online oder laden Sie Bedienerhandbuch nach Nein Minka Lavery 4365-84 herunter. Minka Lavery 4365-84 Instructions / Assembly Benutzerhandbuch

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 1
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 0
INSTALLATION INSTRUCTION 4365
For Flush Mount Ceiling Fixture
WARNING! SHUT POWER OFF AT FUSE OR CIRCUIT BREAKER .
AVERTISSEMENT! COUPER LE COURANT AU NIVEAU DES FUSIBLES OU DU DISJONCTEUR.
READ AND SAVE THESE INSTRUCTIONS
Fig.1
NOTE: CONSULT A QUALIFIED ELECTRICIAN TO
ENSURE CORRECT BRANCH CIRCUIT
CONDUCTOR. MIN 90˚C SUPPLY CONDUCTORS.
MOUNTING THE FIXTURE (Fig. 1)
1. Shut off the power at the circuit breaker and remove
the old fixture, including the mounting hardware.
2. Carefully remove the fixture from the carton and
check that all parts are included as shown in the
illustration.
3. Thread the two mounting screws (C) (Size:#8-
32*1.5”L) about 1/4” into the pre-drilled holes in the
crossbar (A).
4. Secure the crossbar (A) to the junction box using the
junction box screws (B) (Size:#8-32*0.6”L). The side
of the mounting bar marked “GND” must face out.
CONNECTING THE WIRES (Fig. 2)
5. At this point, connect the electrical wires as shown in
Fig. 2, making sure that all wire connectors are
secured. If your outlet box has a ground wire (green
or bare copper), connect the fixture’s ground wire
directly to the mounting plate using the green screw
provided. After the wires are connected, tuck them
carefully inside the outlet box.
COMPLETING THE INSTALLATION (Fig. 1)
6. Raise and mount the ceiling pan (D) by placing it
over both mounting screws (C) so that they protrude
through the “keyholes” in the bottom of the pan.
Rotate the ceiling pan (D) until the screws are in the
slots of the “keyholes” and tighten with a screwdriver.
Install the light bulb(s) in accordance with the fixture’s
specifications. (DO NOT EXCEED THE SPECIFIED
WATTAGE!) (NE PAS DEPASSER LA PUISSANCE
NOMINALE MAXIMALE!).
7. Thread the nut (F) onto the nipple (H), then thread
the nipple (G) into the coupling (E) and tighten with
the nut (F).
8. Slide glass (H) and iron washer (J) onto the nipple
(G) and secure with the hex nut (K).
9. Slide the cap (L) and the cap (M) over the nipple (G)
and secure with the finial (N).
Return power to the junction box and test the fixture.
Your installation is now complete.
Fig.2
A
B
C
D
E
F
J
K
L
M
N
H
G
Set#
-Crossbar
-Ground screw
-Mounting screws*2
-Junction box screws*2
A-016
Seitenansicht 0
1

Inhaltsverzeichnis

Seite 1 - INSTALLATION INSTRUCTION 4365

INSTALLATION INSTRUCTION 4365For Flush Mount Ceiling FixtureWARNING! SHUT POWER OFF AT FUSE OR CIRCUIT BREAKER .AVERTISSEMENT! COUPER LE COURA

Kommentare zu diesen Handbüchern

Keine Kommentare